Demolition

Commercial Demolition Site (Confidential)

Market Sector: Demolition

Rapid Inlet Protection Across a Large Commercial Property


Erosion & Construction Solutions provided erosion and sediment control for the demolition of a large commercial property in the Chicago area. The site's wide paved lots, lawns, and drives drained to dozens of storm inlets that needed protection at the start of demolition.

After site orientation, ECS crews installed roughly 60 inlet bags across the property, plus Siltworm™ filter sock and straw wattles along curbs. ECS also delivered additional Siltworm™ and 24 inlet baskets to the site in June 2023.

Services Completed:

  • Perimeter Control Installation & Relocation
    • Siltworm™ filter sock and straw wattles along curbs
  • Inlet Protection
    • ~60 inlet bags on lot, lawn, and paver inlets
    • 24 inlet baskets supplied
  • Material Supply
    • Siltworm™ delivered to the site

    Project Details
    Location: Chicagoland, Illinois
    Engagement Duration: Installation phase, June 2023
    Project Partner: Confidential demolition contractor