Distribution & Logistics
Walmart Fulfillment Center Campus
Market Sector: Industrial | Distribution & Logistics
Perimeter Control, Inlet Protection & Trackout Control on an Operating Fulfillment Campus
Erosion & Construction Solutions provides erosion and sediment control support at Walmart's high-tech fulfillment center campus in McCordsville, Indiana. The campus is open and operating, so every BMP has to work around truck traffic, finished landscaping, and stormwater ponds without slowing the facility down.
Working for Dotlich Contractors, ECS installed inlet protection and FODS trackout mats at the site exit, added Erosion Eel® sediment control around the curbed islands beside the wheel wash, and installed wire-backed super silt fence along ponds and buffers. When the site plan changed, our crews relocated fence runs from the contractor's marked-up plans, including 300 to 400 feet near the planned guard house.
Services Completed:
- Perimeter Control Installation & Relocation
- Wire-backed super silt fence
- Silt fence along curbs and stormwater pond edges
- Inlet Protection
- Grate and curb inlet protection
- Tracking Control
- FODS trackout mats at the site exit
- Sediment Control
- Erosion Eel® sediment control at the wheel wash islands (required on Walmart sites)
- Machine Work
- Mini skid steer with trencher attachment for fence installation
Project Details
Location:McCordsville, Indiana
Engagement Duration: Multi-phase, as-needed support, 5+ months (ongoing)
Project Partner:Dotlich Contractors