Water and Wastewater Erosion Control
Crown Point Southeast Wastewater Treatment Plant
Market Sector: Infrastructure | Water & Wastewater
Perimeter silt fence, Siltworm™ filter sock, turbidity curtain, safety fence, and SWPPP signage and maintenance
Erosion & Construction Solutions is providing erosion and sediment control for the City of Crown Point's new Southeast Wastewater Treatment Plant on East 121st Avenue. The plant will take part of the city's flow off the existing system and reduce combined sewer overflows. The site borders a ditch, farm fields, and wooded slopes, so protecting the waterway comes first.
Working for Thieneman Construction, ECS installed roughly 9,500 feet of perimeter silt fence and Siltworm™ filter sock in summer 2026, then returned for safety fence, repairs, and relocations as work progressed. Ahead of a scheduled site audit, our crews completed fence repairs and installed SWPPP signage on short notice. We then added a floating turbidity curtain in the waterway, silt fence along the outfall pipe route, and fence marking the wetland edge.
Services Completed:
- Perimeter Control Installation & Maintenance
- Silt fence (~9,500 LF initial installation)
- Siltworm™ filter sock at road edges and the construction entrance
- Waterway & Wetland Protection
- Floating turbidity curtain
- Silt fence along the outfall pipe route (~300 LF) and wetland edge (~150 LF)
- Site Safety
- Orange safety fence
- SWPPP Compliance
-
- SWPPP sign installation
- Audit-prep repairs and fence replacement
- Fence relocation and repairs after tree damage
Project Details
Location: Crown Point, Indiana
Engagement Duration: Multi-phase, ongoing 4+ months
Project Partner: Thieneman Construction, Inc.